Il Ministro Orlando inaugura il nuovo padiglione del carcere di Vicenza
The new pavilion of Vicenza prison was inaugurated this morning in the presence of/ afore the Ministry of Justice Andrea Orlando.
A new hall that can accommodate 200 people for which StercheleGroup designed and supplied the whole prefabricated structure, consisting of prefabricated load-bearing walls, PREM beams, hollow core slabs, prefabricated sandwich panels complete with windows and steel grids used for partition and facades, concrete stairs and landings and prefabricated bathroom pods in concrete, delivered on site complete with all fittings and installations.
StercheleGroup building system was selected for his technical and technological characteristics combined with an with extreme completeness and easiness of assembly, further reducing the construction schedule required by the contract, but respecting at the same time the specific and special design features related to the peculiarity of this intended use.
Thanks to its highly innovative features, further 5 pavilions throughout Italy are under construction with StercheleGroup building system.