Integrated building solutions

Optimized Site Operations & Reduced Construction Time with the Combination of Structural Building Systems, Bathroom Pods and Additional Prefabricated Components

INTEGRATED BUILDING SOLUTIONS

Prefabricated Structural Systems combined with prefabricated Bathroom Pods

Sterchele Group provides an integrated and flexible construction solution, born from the combination of its Structural Building Systems, Bathroom Pods, and additional Prefabricated Components, ensuring optimized site operations and reduced construction times.

This solution is ideal for large-scale residential projects such as hotels, hospitals, nursing homes, student housing, and correctional facilities, where efficiency and quality are essential. Thanks to our expertise, we tailor each project to specific architectural and functional requirements, offering a complete system that includes beams, slabs, columns, bathroom pods, prefabricated panels, stairs, and other finishing elements.

StercheleGroup acts as a single point of contact, supervising every phase, from design to installation.

This integrated system has already proven successful in the construction of several nursing homes, student housing, hotels, and prisons across Italy.

Project Phases
From Design to Construction Site

  • Feasibility Study
  • Design Consulting
  • Quotation Preparation – Order processing
  • Executive Design for Production
  • Work Schedule
  • Bathroom Pods Mock-up
  • Production
  • Delivery, Installation, and Assembly on-site
  • Testing
  • Customer Service

 Our target audience

  • Professionals, such as architects and designers  
  • Final clients  
  • Construction companies  
  • General contractors 

Other business areas

We simplify construction sites through a prefabricated advanced system: the PREM System, modular and lightweight, perfectly suited for commercial, residential, and industrial buildings. We offer complementary prefabricated components, providing unlimited flexibility and ensuring advantages such as time savings, safety, speed, and sustainability.

StercheleGroup è leader di cellule bagno in CLS , di sistemi costruttivi e travi PREM e di prodotti per l’edilizia.
StercheleGroup è leader di cellule bagno in CLS , di sistemi costruttivi e travi PREM e di prodotti per l’edilizia.

Our prefabricated Bathroom Pods are a cutting-edge, turnkey solution designed to deliver exceptional flexibility, speed, and top-tier craftsmanship through a unique industrial process. Backed by over 30 years of expertise, we specialize in off-site bathroom pods solutions perfect for residential and hospitality, as well as commercial, and office buildings.

With over 50 years of experience, we are based in the province of Vicenza, specializing in the design, supply, and installation of flooring, wall coverings and bathroom furniture, as well as the supply of building materials. In our showrooms we present complete solutions, ensuring our clients a wide selection of products, solid expertise, and excellent price/performance ratio.

StercheleGroup è leader di cellule bagno in CLS , di sistemi costruttivi e travi PREM e di prodotti per l’edilizia.